and Spuyten Duyvil Grand Central-Poughkeepsie service will continue to operate hourly all day.Īlso, the 7:28 p.m. On weekends, six half-hourly trains between Grand Central and Poughkeepsie are suspended until late September to provide track-access time for infrastructure work in the Bronx between Yankees-East 153rd St. Two local trains are added between Harrison and Grand Central, with a transfer at Harrison between the limited-stop trains and the local trains and there will be additional service between New Haven and Grand Central and on the Waterbury Branch.įor the Hudson Line, there will be two new peak trains in the evening and an additional stop at Yankees-East 153rd St. trains from Stamford that made all local stops to Grand Central will become limited-stop local trains, reducing their trip time by about eight minutes. trains making all local stops from Harrison to Grand Central have been restored to provide additional service options from Westchester County stations to the Bronx and Manhattan. ![]() MTA Metro-North Railroad has announced new train schedules that will go into effect on July 10.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |